Friday, June 19, 2009

Hi All,

This blog is undergoing a make-over process. So, if you happen to stumble upon any inconsistencies, or anything weird....I am so sorry. Please excuse the caca merba for a while, k.

Thanks.

Wednesday, June 17, 2009

Update 1 :
It is the second month I'm working from home. So far so good. My routine would start from after the Subuh prayer, by preparing breakfast for Hubby. Then I prepare myself and the kids before sending them to the nursery. By 9 am, i would already be in front of the computer, checking e-mails and start off with the work for the day. I, basically stop at 1.30 pm, and get ready to go and fetch my kids. Since I am working from home, they will only be at the nursery until 2 pm. Spend the afternoon with the kids + sometimes fold the laundry + prepare the dinner + bath the kids. When hubby comes home, we have the dinner at around 6.30 pm. After Maghrib prayer, we will have some times together with kids before they go to sleep at 9.30 pm or so. I would usually try to wake up at 4 am, to get some extra working times. And continue the routine for tomorrow.
Update 2 :
Our house in Seksyen 10, Putra Permai is under the renovation process, and we are due to move in by mid of July. Oh boy, another round of packing and unpacking, I can already feel the heat! Only March/April last year, we were struggling packing our things when we were leaving Norwich for good. In June, when the stuff reached our house, the unpacking process started and never end until now (there are still boxes unopened, sitting quietly upstairs). And, now, just about a year later, the cycle starts again. Luckily, this time, the distance of the two houses only 5 minutes away, so we can just load(some of) the stuff into the cars without any boxes needed.
About the renovation, the areas involved are the kitchen, the downstairs bath and some of the living room area. The workers are from Ancora Prestige Enterprise, a design and build company. We basically discussed our ideas with the designer, and after viewing the house, he came out with 3D design for the output. As an interior designer, he also advises on many aspects of the renovations and suggests most effective design according to our budget. Now, half of the work has been done, so, if everything goes fine, by end of June, it will all be completed.
I'll post the Before-and-After later as I only have the before and in progress photos with me now. Those with house renovation planned in mind, watch out this space for the photos, coz you might want to try this designer and workers.
Till later.
Bye!